Skip to content
Dawn to Earth
Built by Eliot Gevers
Demo Data
GitHub
Use dark appearance
Use light appearance
Loading…
Engineering
public-dawn-loop-ref
Overview
Requirements
Design
Changes
Agreements
Research
Loading…
Docking and Fluid Transfer interface · Interface development
Overview
Requirements
Design
Changes
Agreements
Research
2/2
All
▼
Proposed
Where should the alignment mark stay when the legend panel is removed?
CHG-1193
Compare
Current state
A mark on the removable legend would be easy to read, but the reference would leave with the panel.
Proposed change
A mark on the fixed frame would survive a panel swap; the panel edge might conceal it once seated.
Reason
A mark that disappears with the removed part cannot establish alignment of its replacement.
Decision owner
Fixture concept reviewer
Last activity
Unavailable
Applies to
Docking and Fluid Transfer interface · Interface development
Decision
Compare the fixed and removable reference positions on the concept drawing. No unit is assigned for a fit check.
Follow-up
Unavailable
Affected records
Component CFG-1193
· Engineering · Design · Components
Requirement REQ-1193
· Engineering · Requirements
In review
Index the reviewed Loop qualification document alongside the family summary
CHG-723
Compare
Current state
The development index identifies one document family but does not link the reviewed edition.
Proposed change
Request the edition identifier and retain the summary as a separate reference.
Reason
The family reference alone cannot establish which document edition was reviewed.
Decision owner
Document control reviewer
Last activity
Nov 19, 2026, 11:00 AM UTC
Applies to
Docking and Fluid Transfer interface · Interface development
Decision
Retained the family summary and left the edition review open.
Follow-up
Unavailable
Affected records
Requirement REQ-723
· Engineering · Requirements
Interface IF-723
· Engineering · Design · Interfaces