Engineering
public-dawn-loop-ref
Overview
Requirements
Design
Changes
Agreements
Research
Loading…
Docking and Fluid Transfer interface · Interface development
Overview
Requirements
Design
Changes
Agreements
Research
Records
Qualification
2/2
All
▼
Proposed
Keep the alignment reference when the legend is removed
REQ-1193
Requirement statement
The legend panel should be exchangeable without losing its alignment reference on the fixed display.
Acceptance criterion
The concept drawing identifies the same fixed reference with the panel removed and seated.
Verification method
Concept drawing comparison
Source
Alignment mark on the removable panel or the fixed frame
Linked evidence review
Unavailable
Applies to
Docking and Fluid Transfer interface · Interface development
Requirement traceability
Component CFG-1193
· Engineering · Design · Components
Change CHG-1193
· Engineering · Changes
Approved
Qualification index identifies the reviewed edition
REQ-723
Requirement statement
Record the exact reviewed qualification document edition beside the interface reference.
Acceptance criterion
A reviewer can retrieve the specific document edition cited by the interface index.
Verification method
Document inspection
Source
Qualification document register
Linked evidence review
Unavailable
Applies to
Docking and Fluid Transfer interface · Interface development
Requirement traceability
Interface IF-723
· Engineering · Design · Interfaces