Skip to content
Dawn to Earth
Built by Eliot Gevers
Demo Data
GitHub
Use dark appearance
Use light appearance
Loading…
Engineering
MP-002@miro-bench-a
Overview
Requirements
Design
Changes
Agreements
Research
Loading…
MP-002
Overview
Requirements
Design
Changes
Agreements
Research
2/2
All
▼
Add
In review
Keep the paired card pins under review until removal is observed
CHG-1121
Compare
Decision
Current state
A card on the single pin moves away from its corner reference after motion.
Proposed change
A second index pin retains both corner marks in the comparison. Removal with both pins present was not observed.
Reason
The second pin settles the question of registration, but a teaching card also needs to be changed between examples.
Decision owner
Fixture design reviewer
Last activity
Nov 22, 2026, 4:45 PM UTC
Applies to
Miro payload inspection interface · Rev A · MP-002
Decision
Review card removal from the paired jig before adopting its layout.
Follow-up
Unavailable
Affected records
Component CFG-1121
· Engineering · Design · Components
Requirement REQ-1121
· Engineering · Requirements
Evidence Inspection · Nov 22, 2026, 2:21 PM UTC
· Verification · Vibration
Build BLD-1121
· Production · Builds
Notes
Add note
In review
Obtain a witness sheet naming MP-002
CHG-9362
Compare
Decision
Current state
The index opens the sheet, but its cover identifies the group rather than the article.
Proposed change
Retain the group-labelled sheet and add an article-specific witness reference for MP-002.
Reason
The group label establishes a shared definition. It does not show which unit the inspector saw.
Decision owner
Unavailable
Last activity
Nov 9, 2026, 10:10 AM UTC
Applies to
Miro payload inspection interface · Rev A · MP-002
Decision
Request the witness record naming MP-002 and retain the group sheet as its original context.
Follow-up
Unavailable
Affected records
Requirement REQ-936
· Engineering · Requirements
Interface IF-936
· Engineering · Design · Interfaces
Issue ISS-9362
· Production · Issues
Build BLD-9362
· Production · Builds
Inspection sheet and witness archive
· Verification · Proof pressure
Queued work Q-9362
· Production · Builds
Notes
Add note