Skip to content
Dawn to Earth
Built by Eliot Gevers
Demo Data
GitHub
Use dark appearance
Use light appearance
Loading…
Engineering
MP-011@miro-bench-b
Overview
Requirements
Design
Changes
Agreements
Research
Loading…
MP-011
Overview
Requirements
Design
Changes
Agreements
Research
2/2
All
▼
Add
Approved
Keep the signed Rev B receipt current for MP-011
CHG-9371
Compare
Current state
The signed receipt cites Rev B.
Proposed change
Link the signed Rev B receipt as the current destination and keep the predecessor under its original reference.
Reason
Retaining both links lets the reviewer reconstruct the earlier packet and identify the receipt used for MP-011.
Decision owner
Unavailable
Last activity
Nov 10, 2026, 10:45 AM UTC
Applies to
Miro payload inspection interface · Rev B · MP-011
Decision
The index and receipt agree on the applicable revision.
Follow-up
Unavailable
Affected records
Requirement REQ-937
· Engineering · Requirements
Interface IF-937
· Engineering · Design · Interfaces
Issue ISS-9371
· Production · Issues
Build BLD-9371
· Production · Builds
Review index and attachment receipt
· Verification · Leak
Notes
Add note
Approved
Keep earlier receipt links separate from the approved release
CHG-964
Compare
Current state
The predecessor and replacement shared a receipt title in the inspection index.
Proposed change
Use distinct archive entries and point new Rev B inspection packets at the approved signed receipt.
Reason
Replacing the older entry would erase the record supporting earlier reviews.
Decision owner
Unavailable
Last activity
Nov 17, 2026, 3:15 PM UTC
Applies to
Miro payload inspection interface · Rev B · MP-011, MP-012
Decision
Approve the separate archive entries. The repeat article's receipt stays unavailable until attached.
Follow-up
Unavailable
Affected records
Requirement REQ-964
· Engineering · Requirements
Component CFG-964
· Engineering · Design · Components
Interface IF-964
· Engineering · Design · Interfaces
Retained comparison record
· Verification · Leak
Notes
Add note