Skip to content
Dawn to Earth
Built by Eliot Gevers
Demo Data
GitHub
Use dark appearance
Use light appearance
Loading…
Engineering
MP-011@miro-bench-b
Overview
Requirements
Design
Changes
Agreements
Research
Loading…
MP-011
Overview
Requirements
Design
Changes
Agreements
Research
Records
Qualification
2/2
All
▼
Add
Approved
Indexed inspection receipt matches the article revision
REQ-937
Requirement statement
The review index shall identify the inspection receipt from the applicable revision.
Acceptance criterion
The attachment receipt identifies the revision cited in the review index.
Verification method
Archive record comparison
Source
Unavailable
Linked evidence review
Reviewed
Applies to
Miro payload inspection interface · Rev B · MP-011, MP-012
Requirement traceability
Interface IF-937
· Engineering · Design · Interfaces
Review index and attachment receipt
· Verification · Leak
Notes
Add note
Approved
Inspection packet opens the approved receipt and keeps the earlier copy
REQ-964
Requirement statement
A reader reopening the packet must be able to tell which signed receipt was approved and retrieve the earlier one separately.
Acceptance criterion
The active receipt has a source attribution and applicable revision. The superseded copy can be opened from its historical entry.
Verification method
Archive reference and provenance review
Source
Inspection receipt release register
Linked evidence review
Review pending
Applies to
Miro payload inspection interface · Rev B · MP-011, MP-012
Requirement traceability
Component CFG-964
· Engineering · Design · Components
Interface IF-964
· Engineering · Design · Interfaces
Change CHG-964
· Engineering · Changes
Retained comparison record
· Verification · Leak
Receipt comparison MR-11 · footer transcription
· Verification · Leak
Notes
Add note