Skip to content
Dawn to Earth
Built by Eliot Gevers
Demo Data
GitHub
Use dark appearance
Use light appearance
Loading…
Engineering
PU-012@puriri-b
Overview
Requirements
Design
Changes
Agreements
Research
Loading…
PU-012
Overview
Requirements
Design
Changes
Agreements
Research
Records
Qualification
2/2
All
▼
Add
Defined
The desk display must follow the reference on warming and cooling
REQ-1105
Requirement statement
The probe pocket must maintain useful contact with the probe as the direction of the temperature change reverses.
Acceptance criterion
The comparison must cover both directions with the probe seat identified; agreement on warming alone cannot answer the cooling question.
Verification method
Compare the display and reference curves for the loose and seated probe in each recorded direction.
Source
Loose pocket and spring seat for the display probe
Linked evidence review
Review pending
Applies to
Survey instrument node · Rev B · PU-012
Requirement traceability
Component CFG-1105
· Engineering · Design · Components
Evidence Trace · Nov 22, 2026, 2:05 PM UTC
· Verification · Thermal cycling
Change CHG-1105
· Engineering · Changes
Evidence Worksheet · Nov 24, 2026, 9:21 AM UTC
· Verification · Electronics
Notes
Add note
Approved
Signature belongs to the indexed cover edition
REQ-902
Open follow-up evidence
Requirement statement
The review index shall identify the signed archive cover for the article under review.
Acceptance criterion
The signature page identifies the same article and packet edition as the cover named in the handoff index.
Verification method
Record comparison
Source
Unavailable
Linked evidence review
Returned for follow-up
Filed references
2 unavailable in this selection.
Applies to
Survey instrument node · Rev B · PU-011, PU-012, PU-013
Requirement traceability
Interface IF-902
· Engineering · Design · Interfaces
Change CHG-902
· Engineering · Changes
Notes
Add note