Skip to content
Dawn to Earth
Built by Eliot Gevers
Demo Data
GitHub
Use dark appearance
Use light appearance
Loading…
Engineering
REF-LNSS-01@public-arkedge-lunar-navigation-ref
Overview
Requirements
Design
Changes
Agreements
Research
Loading…
Sample pot and lid-seal inserts
Overview
Requirements
Design
Changes
Agreements
Research
2/2
All
▼
Add
In review
Check whether the apparent improvement repeats before choosing the lid insert
CHG-1115
Compare
Decision
Current state
A corner gap is visible with the flat insert in the archived closure.
Proposed change
The compliant insert has lower normalized loss in its comparison closure.
Reason
The two archived closures favor the compliant insert, but the observations cannot distinguish an insert effect from variation between closures.
Decision owner
Bench fixture reviewer
Last activity
Nov 22, 2026, 4:45 PM UTC
Applies to
SatDrive · Navigation integration · REF-LNSS-01
Decision
Compare additional closures of each insert before making a repeatability claim.
Follow-up
Unavailable
Affected records
Component CFG-1115
· Engineering · Design · Components
Requirement REQ-1115
· Engineering · Requirements
Evidence Trace · Nov 22, 2026, 2:15 PM UTC
· Verification · Leak
Build BLD-1115
· Production · Builds
Notes
Add note
In review
Match the worksheet page to the report packet
CHG-708
Compare
Decision
Current state
The worksheet names a page. The receiving slip names a packet. Neither contains a reference to the other.
Proposed change
Keep the worksheet and report separate until their article identifiers can be reconciled.
Reason
A matching filename cannot establish that the worksheet belongs to the REF-LNSS-01 report.
Decision owner
Integration engineering reviewer
Last activity
Nov 16, 2026, 1:00 PM UTC
Applies to
SatDrive · Navigation integration · REF-LNSS-01
Decision
Retained the worksheet and report as separate records pending an article cross-reference.
Follow-up
Unavailable
Change references
Requirement REQ-708
· Engineering · Requirements
Interface IF-708
· Engineering · Design · Interfaces
Originating issue ·
Issue ISS-708
· Production · Issues
Retained evidence ·
Inspection worksheet and archived report index
· Verification · Proof pressure
Evidence Worksheet · Nov 21, 2026, 3:40 PM UTC
· Verification · Proof pressure
Queued work JOB-708
· Production · Builds
Notes
Add note