Skip to content
Dawn to Earth
Built by Eliot Gevers
Demo Data
GitHub
Use dark appearance
Use light appearance
Loading…
Engineering
RM-010@rimu-a
Overview
Requirements
Design
Changes
Agreements
Research
Loading…
RM-010
Overview
Requirements
Design
Changes
Agreements
Research
Records
Qualification
2/2
All
▼
Add
Approved
Carrier identity visible at panel handoff
REQ-210
Requirement statement
The handoff record shall identify the installed carrier from the assembled panel view.
Acceptance criterion
The handoff photograph shows the carrier and full identifier.
Verification method
Image inspection
Source
Rimu mockup handoff drawing
Linked evidence review
Review pending
Applies to
Survey payload panel · Rev A · RM-010, RM-012
Requirement traceability
Component CFG-210
· Engineering · Design · Components
Carrier traveler media attachment
· Verification · Vibration
Notes
Add note
Approved
Panel and carrier records use the same name for the orientation mark
REQ-960
Requirement statement
A reader using the carrier drawing and the panel record must be able to find the same orientation mark in the assembled view.
Acceptance criterion
A reviewer can trace the same witness label through the carrier definition, panel interface record and retained assembled view.
Verification method
Drawing comparison and record inspection
Source
Carrier orientation witness definition
Linked evidence review
Reviewed
Filed references
1 unavailable in this selection.
Applies to
Survey payload panel · Rev A · RM-010, RM-012
Requirement traceability
Component CFG-960
· Engineering · Design · Components
Interface IF-960
· Engineering · Design · Interfaces
Change CHG-960
· Engineering · Changes
Retained comparison record
· Verification · Vibration
Notes
Add note