Skip to content
Dawn to Earth
Built by Eliot Gevers
Demo Data
GitHub
Use dark appearance
Use light appearance
Loading…
Engineering
RM-016@rimu-b
Overview
Requirements
Design
Changes
Agreements
Research
Loading…
RM-016
Overview
Requirements
Design
Changes
Agreements
Research
Records
Qualification
1/1
All
▼
Add
Approved
Panel clearance witness visible after assembly
REQ-216
Requirement statement
The assembled side view shall show the panel-rail witness through the revised viewing opening.
Acceptance criterion
The assembled side view shows the witness on the panel rail.
Verification method
Image inspection
Source
Rimu Surveyor interface brief
Linked evidence review
Review pending
Applies to
Survey payload panel · Rev B · RM-016
Requirement traceability
Component CFG-216
· Engineering · Design · Components
Issue ISS-216
· Production · Issues
Queued work JOB-216
· Production · Builds
the revised side-view photo index
· Verification · Vibration
Caption index RM16-C · image entry 3
· Verification · Vibration
Notes
Add note