REF-BCT-01@public-blue-canyon-lunar-relay-ref
Overview
Planning
Builds
Issues
Materials
Loading…
Two-channel bench readout
Overview
Planning
Builds
Issues
Materials
1/2
Incomplete
▼
Add
Ready
Record which channel the two-input display shows after unplugging
JOB-1114
Start work
Flag
Next action
Send the reworked display for the missing disconnected-input observation. Keep it separate from the existing comparison in which input B was switched.
Expected output
A channel-state record for the unplugged condition.
Unit revision
REF-BCT-01 · Lunar relay integration
· Operations · Unit readiness
Assembly
Two-input desktop readout
Decision owner
Production technician
Work history
Bench work opened
Production coordinator ·
Nov 22, 2026, 8:00 AM UTC
Two-input desktop readout · REF-BCT-01
Reworked the A/B legend and mapping on the two-input readout
Production technician ·
Nov 22, 2026, 9:30 AM UTC
Two-input desktop readout
Work performed
Kept the original display record and compared it with the corrected mapping while reference input B changed independently.
As-built article
REF-BCT-01 · Lunar relay integration
Installed definition
Corrected A/B display mapping
Observed result
The original display stayed on A when B changed. The reworked version reported the switched channel. The disconnected condition was not measured.
Rework
Entry notes
Add entry note
Separated the printed input legend from the reader channel check
Bench technician ·
Nov 23, 2026, 9:35 AM UTC
Work performed
Filed the moving legend and readout together using the existing A and B card identifiers.
As-built article
REF-BCT-01 · Lunar relay integration
Installed definition
Corrected reader mapping and removable two-window legend
Observed result
The printed B card moved across the window while the reader continued reporting B.
Rework
Entry notes
Add entry note
Links
Change CHG-1114
· Engineering · Changes
Evidence desk-rc-channel-pair
· Verification · Electronics
Requirement REQ-1114
· Engineering · Requirements
Tabletop inspection · RC-04 · input labels during handling
· Verification · Vibration
Evidence Inspection · Nov 23, 2026, 3:20 PM UTC
· Verification · Vibration
Evidence Functional check · Nov 24, 2026, 9:20 AM UTC
· Verification · Electronics
Integration records
· Wiki
Notes
Add note