Loading…
Loading…
| Status | Engineering work | Next step | Last activity |
|---|---|---|---|
| Approved | Add the inspection attachment beside the REF-FFLY-03 reportREF-FFLY-03 · Archive handoffLast activity | Decision · Accepted the two document references in the handoff index.Integration engineering reviewer |
Link both documents in the handoff index
Link the inspection attachment in the same handoff packet and retain the original report reference.
Change CHG-713 · Engineering · Changes