Skip to content
Dawn to Earth
Built by Eliot Gevers
Demo Data
GitHub
Use dark appearance
Use light appearance
Production
Loading…
Select item
Overview
Planning
Builds
Issues
Materials
Stock
Lot trace
Recovery
Reconciliation
Loading…
Select item
Overview
Planning
Builds
Issues
Materials
Stock
Lot trace
Recovery
Reconciliation
Supplier lot notices
10/10
All
▼
Identify the clip in the warm display photographs
LOT-FLOAT-54 · Mask clip notice MC-54
Trace installations
Identify the pad beside the latch witness
LOT-PAD-45 · Pad sleeve discrepancy PS-45
Trace installations
Match the scuffed tray stop to its carton
LOT-STOP-12 · Stop return note ST-12
Trace installations
Trace the contrast strips visible in the comparison photographs
LOT-MARK-73 · Faded strip report MK-73
Trace installations
Trace the long tab that reached the finger recess
LOT-TAB-26 · Drawer return DR-26
Trace installations
Trace the offset clip fitted under the cover
LOT-CLIP-31 · Clip carton note CN-31
Trace installations
Trace the raised guard on the comparison counter
LOT-GUARD-38 · Guard carton correction GC-38
Trace installations
Trace the spacer behind the indicator guide
LOT-SPACER-47 · Spacer bag correction SB-47
Trace installations
Which Rimu build used tabs from LOT-TAB-08?
LOT-TAB-08 · Receiving discrepancy RD-008
Trace installations
Which units have labels from the corrected packing record?
LOT-LABEL-24 · Supplier notice SN-024
Trace installations